Suquamish Tribe Chico Creek Restoration Project Habitat Restoration Consultant RFP 2026
- Due
- Aug 7, 2026
- Deadline passed
- Posted
- Jul 14, 2026
- Primary contact
- Steve Todd
- (360) 865-0615
The 30-second brief
The Suquamish Tribe seeks a qualified habitat restoration consultant or engineer to provide feasibility, restoration design alternatives, conceptual (30%) design, and permitting services for the Chico Creek Restoration Project located between Erlands Point Road NW and State Route 3 within Kitsap County, Washington. The project involves channel, fish passage, riparian, and floodplain habitat connectivity improvements, topographic and geotechnical surveys, hydraulic modeling, critical areas mapping, cost estimates, environmental permitting (USACE, NEPA, SEPA, ESA, NHPA Section 106), and baseline and post-construction monitoring plans. Proposals are due by August 7, 2026, at 5:00 pm PDT via email to Steve Todd. A site visit is scheduled for July 22, 2026. Evaluation criteria include relevant experience and availability of key personnel, approach to project, ability to meet project budget, ability to meet project schedule, past performance, and references.
Relevant experience and availability of key personnel 5 points, approach to project 5 points, ability to meet the project budget 5 points, ability to meet the project schedule 5 points, past performance 5 points, references 2 points
Hear what Suquamish Indian Tribe plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Suquamish Tribe seeks a qualified habitat restoration consultant or engineer to provide feasibility, restoration design alternatives, conceptual (30%) design, and permitting services for the Chico Creek Restoration Project located between Erlands Point Road NW and State Route 3 within Kitsap County, Washington.
The project involves channel, fish passage, riparian, and floodplain habitat connectivity improvements, topographic and geotechnical surveys, hydraulic modeling, critical areas mapping, cost estimates, environmental permitting (USACE, NEPA, SEPA, ESA, NHPA Section 106), and baseline and post-construction monitoring plans. Proposals are due by August 7, 2026, at 5:00 pm PDT via email to Steve Todd. A site visit is scheduled for July 22, 2026. Evaluation criteria include relevant experience and availability of key personnel, approach to project, ability to meet project budget, ability to meet project schedule, past performance, and references.
EVALUATION CRITERIA
6- Relevant experience and availability of key personnel 5 points
- Approach to project 5 points
- Ability to meet the project budget 5 points
- Ability to meet the project schedule 5 points
- Past performance 5 points
- References 2 points
- Submit to
- Email inbox, shown to Civic IQ members.Sign up free to see it
- Scope location
- Kitsap County, WA
- Reported agency
- Suquamish Tribe
Questions about this RFP
How do I respond to this RFP from Suquamish Indian Tribe?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is August 7, 2026. Submissions go to an agency email inbox; Civic IQ members see the exact address. For questions, contact Steve Todd.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Suquamish Indian Tribe in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Steve Todd at (360) 865-0615. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Relevant experience and availability of key personnel 5 points, approach to project 5 points, ability to meet the project budget 5 points, ability to meet the project schedule 5 points, past performan..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Suquamish Indian Tribe?
All active and historical solicitations from Suquamish Indian Tribe are tracked and searchable. As a tribal government agency, Suquamish Indian Tribe regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Suquamish Indian Tribe for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Kitsap County, WA. Review the full solicitation for detailed scope requirements.