Rhode Island Turnpike and Bridge Authority - Claiborne Pell Bridge Rehabilitation - Contract 25-15 (2026)
- Due
- Oct 19, 2026
- Deadline passed
- Posted
- Sep 1, 2026
The 30-second brief
The Rhode Island Turnpike and Bridge Authority is seeking bids for Contract No. 25-15 Claiborne Pell Bridge Rehabilitation (Newport Bridge) connecting Jamestown and Newport, RI. Work includes deck rehabilitation with partial depth rehabilitation, hydro demolition, and full depth rehabilitation at joints; joint rehabilitation including finger joints at towers, polymer expansion joints, and deck control joints; exterior and partial interior tower painting for two towers; tower steel rehabilitation including compression link replacement at 7 of 8 existing links and access platform construction; elevator rehabilitation for two service elevators; stair access tower construction; suspender rope replacement; main cable access and platforms for 12 panels; and traffic control with a full bridge length temporary movable barrier. Proposals are due by 10:00 AM on October 19, 2026. A non-mandatory pre-bid conference and site visit will be held on September 14, 2026, at 9:00 AM. Written questions are due by September 21, 2026. Requirements include a certified check or bid bond of not less than 5 percent of the total bid price, a 100 percent performance bond, and completed Statement of Qualifications forms.
Partial depth rehabilitation from west approach to Pier 1E and approach spans 22E-34E; hydro demolition; full depth rehabilitation at joints; replacement of finger joints at towers; construction of future maintenance access platforms; replacement of expansion joints with polymer expansion joints; replacement of deck control joints; exterior and interior painting of 2 towers; compression link replacement at 7 of 8 existing compression links and access platforms; rehabilitation of 2 existing service elevators within towers; 2 stair access towers; replacement of suspender ropes along suspended span; access and platforms for 12 panels of main cable; traffic control throughout construction duration; full bridge length temporary movable barrier and movable barrier mover
Lowest responsive and responsible Bidder
Hear what Rhode Island Turnpike and Bridge Authority | State of Rhode Island plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Rhode Island Turnpike and Bridge Authority is seeking bids for Contract No. 25-15 Claiborne Pell Bridge Rehabilitation (Newport Bridge) connecting Jamestown and Newport, RI. Work includes deck rehabilitation with partial depth rehabilitation, hydro demolition, and full depth rehabilitation at joints; joint rehabilitation including finger joints at towers, polymer expansion joints, and deck control joints; exterior and partial interior tower painting for two towers; tower steel rehabilitation including compression link replacement at 7 of 8 existing links and access platform construction; elevator rehabilitation for two service elevators; stair access tower construction; suspender rope replacement; main cable access and platforms for 12 panels; and traffic control with a full bridge length temporary movable barrier.
Proposals are due by 10:00 AM on October 19, 2026. A non-mandatory pre-bid conference and site visit will be held on September 14, 2026, at 9:00 AM. Written questions are due by September 21, 2026. Requirements include a certified check or bid bond of not less than 5 percent of the total bid price, a 100 percent performance bond, and completed Statement of Qualifications forms.
EVALUATION CRITERIA
Lowest responsive and responsible Bidder
REQUIRED DELIVERABLES
15- Partial depth rehabilitation from west approach to Pier 1E and approach spans 22E-34E
- Hydro demolition
- Full depth rehabilitation at joints
- Replacement of finger joints at towers
- Construction of future maintenance access platforms
- Replacement of expansion joints with polymer expansion joints
- Replacement of deck control joints
- Exterior and interior painting of 2 towers
- Compression link replacement at 7 of 8 existing compression links and access platforms
- Rehabilitation of 2 existing service elevators within towers
- 2 stair access towers
- Replacement of suspender ropes along suspended span
- Access and platforms for 12 panels of main cable
- Traffic control throughout construction duration
- Full bridge length temporary movable barrier and movable barrier mover
REQUIRED ATTACHMENTS
certified check or bid bond not less than 5 percent of total bid price, Statement of Qualifications forms, performance bond
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Jamestown and Newport, Rhode Island
- Reported agency
- Rhode Island Turnpike and Bridge Authority
Questions about this BID
How do I respond to this Bid from Rhode Island Turnpike and Bridge Authority | State of Rhode Island?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 19, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Rhode Island Turnpike and Bridge Authority | State of Rhode Island in RI, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Partial depth rehabilitation from west approach to Pier 1E and approach spans 22E-34E; hydro demolition; full depth rehabilitation at joints; replacement of finger joints at towers; construction of future maintenance access platforms; replacement of expansion joints with polymer expansion joints; re. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest responsive and responsible Bidder" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Rhode Island Turnpike and Bridge Authority | State of Rhode Island?
All active and historical solicitations from Rhode Island Turnpike and Bridge Authority | State of Rhode Island are tracked and searchable. As a state agency, Rhode Island Turnpike and Bridge Authority | State of Rhode Island regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: certified check or bid bond not less than 5 percent of total bid price, Statement of Qualifications forms, performance bond. Review the full document from Rhode Island Turnpike and Bridge Authority | State of Rhode Island for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Jamestown and Newport, Rhode Island. Review the full solicitation for detailed scope requirements.