Missouri Department of Transportation - Route 61 and Route 27 Coldmill and Resurfacing Project - Job JNE0048, Clark & Lewis Counties, 2026
- Due
- Nov 20, 2026
- Due today
- Posted
- Aug 10, 2026
- Primary contact
- Zachary S. Walker
- (660) 385-8267
The 30-second brief
The Missouri Department of Transportation is seeking bids for highway construction and improvement under federal project number FAF 61-4(199). The project involves coldmilling and asphaltic concrete resurfacing of Route 61 and Route 27 in Clark and Lewis Counties, spanning a total length of 14.511 miles from Alexandria to Canton. Required scope includes bituminous pavement mixture PG64-22 (BP-1), asphaltic concrete mixture PG76-22 (SP125B mix), tack coat, permanent aggregate edge treatment, rumble strips, and pavement marking paint. Electronic bids are due via Bid Express by November 20, 2026, at 11:00 a.m. Bidders must meet MoDOT prequalification requirements 7 days prior to opening and submit required project documents.
Coldmill and resurface Route 61, Job JNE0048, 14.511 miles; Bituminous Pavement Mixture PG64-22 (BP-1); Asphaltic Concrete Mixture PG76-22 (SP125B Mix); Tack Coat - Non-Tracking; Permanent Aggregate Edge Treatment; Bituminous Shoulder and Centerline Rumble Strips
Price
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Missouri Department of Transportation is seeking bids for highway construction and improvement under federal project number FAF 61-4(199).
The project involves coldmilling and asphaltic concrete resurfacing of Route 61 and Route 27 in Clark and Lewis Counties, spanning a total length of 14.511 miles from Alexandria to Canton. Required scope includes bituminous pavement mixture PG64-22 (BP-1), asphaltic concrete mixture PG76-22 (SP125B mix), tack coat, permanent aggregate edge treatment, rumble strips, and pavement marking paint. Electronic bids are due via Bid Express by November 20, 2026, at 11:00 a.m. Bidders must meet MoDOT prequalification requirements 7 days prior to opening and submit required project documents.
EVALUATION CRITERIA
Price
REQUIRED DELIVERABLES
6- Coldmill and resurface Route 61, Job JNE0048, 14.511 miles
- Bituminous Pavement Mixture PG64-22 (BP-1)
- Asphaltic Concrete Mixture PG76-22 (SP125B Mix)
- Tack Coat - Non-Tracking
- Permanent Aggregate Edge Treatment
- Bituminous Shoulder and Centerline Rumble Strips
REQUIRED ATTACHMENTS
5- Contractor Prequalification Questionnaire
- Bid Guaranty
- Subcontractor Disclosure Form
- DBE Identification Submittal
- Signature and Identity of Bidder
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Clark County, MO
- Reported agency
- Missouri Department of Transportation
Questions about this BID
How do I respond to this Bid from Missouri Department of Transportation | State of Missouri?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 20, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Zachary S. Walker.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Missouri Department of Transportation | State of Missouri in MO, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Zachary S. Walker at (660) 385-8267. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Coldmill and resurface Route 61, Job JNE0048, 14.511 miles; Bituminous Pavement Mixture PG64-22 (BP-1); Asphaltic Concrete Mixture PG76-22 (SP125B Mix); Tack Coat - Non-Tracking; Permanent Aggregate Edge Treatment; Bituminous Shoulder and Centerline Rumble Strips. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Missouri Department of Transportation | State of Missouri?
All active and historical solicitations from Missouri Department of Transportation | State of Missouri are tracked and searchable. As a state agency, Missouri Department of Transportation | State of Missouri regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 20, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Contractor Prequalification Questionnaire, Bid Guaranty, Subcontractor Disclosure Form, DBE Identification Submittal, Signature and Identity of Bidder. Review the full document from Missouri Department of Transportation | State of Missouri for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Clark County, MO. Review the full solicitation for detailed scope requirements.