The 30-second brief
Bridge deck replacement over Pike Creek on Route BU67 in Butler County, Missouri (Job JSE0106, Contract ID 261120-H11, Federal Project FAF 67-1(29)). Scope includes removal of existing bridge deck, Class 1 excavation, bridge approach slab, slab on steel, type D barrier, mechanical bar splices, protective coating for concrete bents and piers, shear connectors, slab drains, non-destructive testing, vertical drain at end bents, guardrail installation, shaped slopes class III, rock blanket, porous backfill, temporary traffic control, erosion control, and pavement marking. Submission deadline is November 20, 2026, at 11:00 a.m. prevailing local time via Bid Express (www.bidx.com). Bids require a contractor prequalification questionnaire, bid guaranty meeting Sec 102 requirements, subcontractor disclosure form, and DBE identification submittal. Liquidated damages apply for administrative costs ($500/day) and road user costs ($2,300/day) as well as stormwater compliance deficiencies ($2,000/day).
Removal of existing bridge deck; Class 1 excavation; bridge approach slab (major); slab on steel; type D barrier; mechanical bar splices; protective coating - concrete bents and piers (epoxy); shear connectors; slab drains; non-destructive testing; vertical drain at end bents; MGS guardrail; MGS bridge approach transition section; type A crashworthy end terminal (MASH); misc. modified shaping slopes class III; type 5 aggregate for base; gravel (a) or crushed stone (b); type A2 shoulder; concrete approach pavement; furnishing and placing type 2 rock blanket; impact attenuators; truck mounted attenuator (TMA); construction signs; channelizer; direction indicator barricade; flashing arrow panel; temporary traffic barrier anchored; relocating temporary traffic barrier; mobilization; temporary removable marking tape; pavement marking paint; permanent erosion control geotextile; contractor furnished surveying and staking; mulching; seeding; rock ditch check; sediment removal; temporary seeding; silt fence; type C berm
Price
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Bridge deck replacement over Pike Creek on Route BU67 in Butler County, Missouri (Job JSE0106, Contract ID 261120-H11, Federal Project FAF 67-1(29)).
Scope includes removal of existing bridge deck, Class 1 excavation, bridge approach slab, slab on steel, type D barrier, mechanical bar splices, protective coating for concrete bents and piers, shear connectors, slab drains, non-destructive testing, vertical drain at end bents, guardrail installation, shaped slopes class III, rock blanket, porous backfill, temporary traffic control, erosion control, and pavement marking. Submission deadline is November 20, 2026, at 11:00 a.m. prevailing local time via Bid Express (www.bidx.com). Bids require a contractor prequalification questionnaire, bid guaranty meeting Sec 102 requirements, subcontractor disclosure form, and DBE identification submittal. Liquidated damages apply for administrative costs ($500/day) and road user costs ($2,300/day) as well as stormwater compliance deficiencies ($2,000/day).
EVALUATION CRITERIA
Price
REQUIRED DELIVERABLES
40- Removal of existing bridge deck
- Class 1 excavation
- Bridge approach slab (major)
- Slab on steel
- Type D barrier
- Mechanical bar splices
- Protective coating - concrete bents and piers (epoxy)
- Shear connectors
- Slab drains
- Non-destructive testing
- Vertical drain at end bents
- MGS guardrail
- MGS bridge approach transition section
- Type A crashworthy end terminal (MASH)
- Misc. modified shaping slopes class III
- Type 5 aggregate for base
- Gravel (a) or crushed stone (b)
- Type A2 shoulder
- Concrete approach pavement
- Furnishing and placing type 2 rock blanket
- Impact attenuators
- Truck mounted attenuator (TMA)
- Construction signs
- Channelizer
- Direction indicator barricade
- Flashing arrow panel
- Temporary traffic barrier anchored
- Relocating temporary traffic barrier
- Mobilization
- Temporary removable marking tape
- Pavement marking paint
- Permanent erosion control geotextile
- Contractor furnished surveying and staking
- Mulching
- Seeding
- Rock ditch check
- Sediment removal
- Temporary seeding
- Silt fence
- Type C berm
REQUIRED ATTACHMENTS
9- Contractor Prequalification Questionnaire
- Bid Guaranty
- Subcontractor Disclosure Form
- DBE Identification Submittal
- Contractor's Affidavit Regarding Settlement of Claims (Form C-242)
- Final Change Order
- DBE Participation List and Final Verification
- Affidavit - Compliance with the Prevailing Wage Law
- 501 Concrete Plant Checklist
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Butler, Missouri
- Reported agency
- Missouri Department of Transportation
Questions about this BID
How do I respond to this Bid from Missouri Department of Transportation | State of Missouri?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 20, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Seiji Shimbo.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Missouri Department of Transportation | State of Missouri in MO, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Seiji Shimbo at (573) 751-2876. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Removal of existing bridge deck; Class 1 excavation; bridge approach slab (major); slab on steel; type D barrier; mechanical bar splices; protective coating - concrete bents and piers (epoxy); shear connectors; slab drains; non-destructive testing; vertical drain at end bents; MGS guardrail; MGS bri. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Missouri Department of Transportation | State of Missouri?
All active and historical solicitations from Missouri Department of Transportation | State of Missouri are tracked and searchable. As a state agency, Missouri Department of Transportation | State of Missouri regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 20, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Contractor Prequalification Questionnaire, Bid Guaranty, Subcontractor Disclosure Form, DBE Identification Submittal, Contractor's Affidavit Regarding Settlement of Claims (Form C-242), Final Change O. Review the full document from Missouri Department of Transportation | State of Missouri for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Butler, Missouri. Review the full solicitation for detailed scope requirements.