Missouri Department of Transportation - Bridge and Box Culvert Replacements on Route A - Contract ID 261218-H03
- Due
- Dec 18, 2026
- 26 days left
- Posted
- Sep 21, 2026
- Primary contact
- Seiji Shimbo
- (573) 380-9765
The 30-second brief
Constructing or improving Route A in Wayne County under Jobs J9S3815 and JSE0147. Work includes bridge deck replacement over Otter Creek (Bridge A05181) and box culvert replacement over Small Creek (Bridge A9541), along with roadway improvements, grading, paving with bituminous pavement mixture PG64-22 or optional pavement, rock blanket installation, guardrail installation, and erosion control. Federal Project Numbers FAS S705 (018) and FAS S705(47). Bids are due by December 18, 2026, at 11:00 a.m. prevailing local time, submitted electronically via Bid Express (www.bidx.com). Required documents include Contractor Prequalification Questionnaire, Bid Guaranty, Subcontractor Disclosure Form, and DBE Identification Submittal for Federal Projects.
Bridge deck replacement over Otter Creek (Job J9S3815, 0.118 miles); Box culvert replacement over Small Creek (Job JSE0147, 0.1 miles); clearing and grubbing; excavation; aggregate base; bituminous pavement mixture PG64-22; rock blanket; MGS guardrail; pavement marking paint; seeding and mulching; erosion control geotextile
Price
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Constructing or improving Route A in Wayne County under Jobs J9S3815 and JSE0147.
Work includes bridge deck replacement over Otter Creek (Bridge A05181) and box culvert replacement over Small Creek (Bridge A9541), along with roadway improvements, grading, paving with bituminous pavement mixture PG64-22 or optional pavement, rock blanket installation, guardrail installation, and erosion control. Federal Project Numbers FAS S705 (018) and FAS S705(47). Bids are due by December 18, 2026, at 11:00 a.m. prevailing local time, submitted electronically via Bid Express (www.bidx.com). Required documents include Contractor Prequalification Questionnaire, Bid Guaranty, Subcontractor Disclosure Form, and DBE Identification Submittal for Federal Projects.
EVALUATION CRITERIA
Price
REQUIRED DELIVERABLES
11- Bridge deck replacement over Otter Creek (Job J9S3815, 0.118 miles)
- Box culvert replacement over Small Creek (Job JSE0147, 0.1 miles)
- Clearing and grubbing
- Excavation
- Aggregate base
- Bituminous pavement mixture PG64-22
- Rock blanket
- MGS guardrail
- Pavement marking paint
- Seeding and mulching
- Erosion control geotextile
REQUIRED ATTACHMENTS
5- Contractor Prequalification Questionnaire
- Bid Guaranty
- Subcontractor Disclosure Form
- DBE Identification Submittal
- Signature and Identity of Bidder
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Wayne County, MO
- Reported agency
- Missouri Department of Transportation
Questions about this BID
How do I respond to this Bid from Missouri Department of Transportation | State of Missouri?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 18, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Seiji Shimbo.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Missouri Department of Transportation | State of Missouri in MO, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Seiji Shimbo at (573) 380-9765. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Bridge deck replacement over Otter Creek (Job J9S3815, 0.118 miles); Box culvert replacement over Small Creek (Job JSE0147, 0.1 miles); clearing and grubbing; excavation; aggregate base; bituminous pavement mixture PG64-22; rock blanket; MGS guardrail; pavement marking paint; seeding and mulching; e. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Missouri Department of Transportation | State of Missouri?
All active and historical solicitations from Missouri Department of Transportation | State of Missouri are tracked and searchable. As a state agency, Missouri Department of Transportation | State of Missouri regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of December 18, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Contractor Prequalification Questionnaire, Bid Guaranty, Subcontractor Disclosure Form, DBE Identification Submittal, Signature and Identity of Bidder. Review the full document from Missouri Department of Transportation | State of Missouri for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Wayne County, MO. Review the full solicitation for detailed scope requirements.