Middletown Fire Protection District, Louisville, KY·Fire District
Middletown Fire Protection District is soliciting proposals for the design, permitting, and installation of a complete wet-pipe automatic fire sprinkler system at Station 34. Proposals are due by September 18, 2026.
Best interests of the district, reject any/all proposals, waive informalities, request clarifications, negotiate scope, schedule, and pricing
Engineering, Hydraulic calculations, Permitting, Water supply evaluation, Piping, Fire department connection, Backflow prevention, Fire alarm interface, Testing, Commissioning, Owner training, Restoration
Proposal specifications and requirements available from the agency
Common questions about this solicitation, answered from the record.
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 18, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: Mail to: Anchorage Middletown Fire & EMS, Attn: RFP Response, 108 Urton Lane, Louisville, KY 40223 or email: [email protected]. For questions, contact Joe Wolfe.
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Best interests of the district, reject any/all proposals, waive informalities, request clarifications, negotiate scope, schedule, and pricing" Vendors should carefully align their proposals with each criterion to maximize their score.
All active and historical solicitations from Middletown Fire Protection District are tracked and searchable. As a fire district agency, Middletown Fire Protection District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Based on the posted deadline of September 18, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Proposal specifications and requirements available from the agency. Review the full document from Middletown Fire Protection District for the complete list.
Most government agencies, including Middletown Fire Protection District in KY, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Joe Wolfe at (502) 996-9358. Questions and answers are typically shared with all prospective bidders.
This solicitation defines a specific project scope. The scope covers the following locations: Anchorage, Kentucky. Review the full solicitation for detailed scope requirements.
The solicitation specifies the following deliverables: Engineering, Hydraulic calculations, Permitting, Water supply evaluation, Piping, Fire department connection, Backflow prevention, Fire alarm interface, Testing, Commissioning, Owner training, Restoration. Proposals should clearly address how each deliverable will be met.
This solicitation is already public — the specs are set. Civic IQ reads board agendas, budgets, and council sessions across Middletown Fire Protection District and 80,000+ agencies, so you see the next project while it's still being scoped.
B2G and SLED sales intelligence. Surface government procurement signals from 80,000+ state, local, and education agencies months before the RFP.