Matanuska-Susitna Borough School District Birchtree Charter School Project Manual 2026 - 25-095P
Midnight Sun Family Learning CenterSchool · Wasilla, AK- Due
- Jan 28, 2026
- Deadline passed
- Posted
- Jan 28, 2026
The 30-second brief
Matanuska-Susitna Borough School District is soliciting bids for the Birchtree Charter School project under Project Number 25-095P. The comprehensive scope of work includes concrete reinforcing and cast-in-place concrete, exterior stone cladding, anchored stone mortarless masonry veneer, structural and cold-formed metal framing, metal fabrications, rough carpentry, and thermal/moisture protection. Interior work covers doors, windows, finishes (tiling, flooring, painting), specialties (signage, partitions), and equipment (food service, gymnasium, playground). Major systems include hydraulic elevators, fire suppression, plumbing, HVAC (boilers, hydronic piping, air units), electrical, communications, and electronic safety/security. Site work involves earth moving, sidewalks, landscaping, and utilities (water distribution, sanitary sewer). The project is at the 95% submittal stage as of January 28, 2026.
Product Data, Design Mixtures, Shop Drawings, Samples, Sustainable Design Submittals, Qualification Data, Test Reports, Maintenance Material Submittals
Hear what Midnight Sun Family Learning Center plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Matanuska-Susitna Borough School District is soliciting bids for the Birchtree Charter School project under Project Number 25-095P. The comprehensive scope of work includes concrete reinforcing and cast-in-place concrete, exterior stone cladding, anchored stone mortarless masonry veneer, structural and cold-formed metal framing, metal fabrications, rough carpentry, and thermal/moisture protection.
Interior work covers doors, windows, finishes (tiling, flooring, painting), specialties (signage, partitions), and equipment (food service, gymnasium, playground). Major systems include hydraulic elevators, fire suppression, plumbing, HVAC (boilers, hydronic piping, air units), electrical, communications, and electronic safety/security. Site work involves earth moving, sidewalks, landscaping, and utilities (water distribution, sanitary sewer). The project is at the 95% submittal stage as of January 28, 2026.
REQUIRED DELIVERABLES
8- Product Data
- Design Mixtures
- Shop Drawings
- Samples
- Sustainable Design Submittals
- Qualification Data
- Test Reports
- Maintenance Material Submittals
REQUIRED ATTACHMENTS
Structural Drawings
- Scope location
- Anchorage, AK
- Reported agency
- Matanuska-Susitna Borough School District
Questions about this BID
How do I respond to this Bid from Midnight Sun Family Learning Center?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is January 28, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Midnight Sun Family Learning Center in AK, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Product Data, Design Mixtures, Shop Drawings, Samples, Sustainable Design Submittals, Qualification Data, Test Reports, Maintenance Material Submittals. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Midnight Sun Family Learning Center?
All active and historical solicitations from Midnight Sun Family Learning Center are tracked and searchable. As a school agency, Midnight Sun Family Learning Center regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Structural Drawings. Review the full document from Midnight Sun Family Learning Center for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Anchorage, AK. Review the full solicitation for detailed scope requirements.