Kerkhoven-Murdock-Sunburg 775 - FY2027 KMS Cat 2 Uninterruptible Power Supply - 270004991 (2027)
- Due
- Dec 15, 2026
- 21 days left
- Posted
- Nov 17, 2026
- Primary contact
- Annette Fernholz
- (320) 264-1411 ext 1932
The 30-second brief
Kerkhoven-Murdock-Sunburg 775 school district in Kerkhoven, Minnesota is seeking proposals for E-Rate funding year 2027 under FCC Form 470 application number 270004991. The scope includes two (2) APC Smart-UPS SMT2200RM2UC or equivalent uninterruptible power supply (UPS) units with approximately 2,200 VA capacity or more, featuring line-interactive or online design, pure sine wave output, rack-mount form factor, hot-swappable batteries, automatic voltage regulation (AVR), LCD status display, network management capability, surge and overload protection, and graceful shutdown capability. Requirements also include rack rails, mounting hardware, power cords, and basic maintenance of internal connections supporting district-owned network switches and wireless access points. All costs not eligible for E-Rate funding must be clearly identified separately. Proposals are due by December 15, 2026. Price is the primary evaluation factor.
Two (2) APC Smart-UPS SMT2200RM2UC or equivalent uninterruptible power supply units (approx 2, 200 VA capacity or more), Necessary software and licenses, Rack rails/mounting hardware, Power cords, And basic maintenance of internal connections.
Price (primary factor)
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Kerkhoven-Murdock-Sunburg 775 school district in Kerkhoven, Minnesota is seeking proposals for E-Rate funding year 2027 under FCC Form 470 application number 270004991.
The scope includes two (2) APC Smart-UPS SMT2200RM2UC or equivalent uninterruptible power supply (UPS) units with approximately 2,200 VA capacity or more, featuring line-interactive or online design, pure sine wave output, rack-mount form factor, hot-swappable batteries, automatic voltage regulation (AVR), LCD status display, network management capability, surge and overload protection, and graceful shutdown capability. Requirements also include rack rails, mounting hardware, power cords, and basic maintenance of internal connections supporting district-owned network switches and wireless access points. All costs not eligible for E-Rate funding must be clearly identified separately. Proposals are due by December 15, 2026. Price is the primary evaluation factor.
EVALUATION CRITERIA
Price (primary factor)
REQUIRED DELIVERABLES
Two (2) APC Smart-UPS SMT2200RM2UC or equivalent uninterruptible power supply units (approx 2, 200 VA capacity or more), Necessary software and licenses, Rack rails/mounting hardware, Power cords, And basic maintenance of internal connections.
- Scope location
- Kerkhoven, MN
- Reported agency
- Kerkhoven-Murdock-Sunburg 775
Questions about this RFP
How do I respond to this RFP from Kerkhoven-Murdock-Sunburg?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 15, 2026. The solicitation specifies required deliverables that must be addressed in your response. For questions, contact Annette Fernholz.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Kerkhoven-Murdock-Sunburg in MN, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Annette Fernholz at (320) 264-1411 ext 1932. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Two (2) APC Smart-UPS SMT2200RM2UC or equivalent uninterruptible power supply units (approx 2, 200 VA capacity or more), Necessary software and licenses, Rack rails/mounting hardware, Power cords, And basic maintenance of internal connections.. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price (primary factor)" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Kerkhoven-Murdock-Sunburg?
All active and historical solicitations from Kerkhoven-Murdock-Sunburg are tracked and searchable. As a school agency, Kerkhoven-Murdock-Sunburg regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of December 15, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Kerkhoven-Murdock-Sunburg for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Kerkhoven, MN. Review the full solicitation for detailed scope requirements.