Housing Authority of Henderson Electrical Upgrades for 200 Units at AMP 1 Bid 2026
Housing Authority of HendersonLocal Housing Authority · Henderson, KY- Due
- Jul 13, 2026
- Deadline passed
- Posted
- Jun 12, 2026
- Duration
- 24 months
- Primary contact
- Shannon Kavanaugh
- (270) 827-1294 ext 1136
The 30-second brief
The Housing Authority of Henderson is soliciting sealed bids for electrical upgrades across 200 units at Asset Management Property 1. The project includes replacing receptacles, wiring, and installing LED fixtures, with a 24-month completion term.
Bid Form, Non-Collusive Affidavit, Drug Free Workplace Certification, Section 3 Certification, References, Sub-Contractor Listing, Insurance Certificate
Best low bid, Bid price, Quality of product
Hear what Housing Authority of Henderson plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Housing Authority of Henderson is soliciting sealed bids for electrical upgrades across 200 units at Asset Management Property 1. The project includes replacing receptacles, wiring, and installing LED fixtures, with a 24-month completion term.
EVALUATION CRITERIA
3- Best low bid
- Bid price
- Quality of product
REQUIRED DELIVERABLES
7- Bid Form
- Non-Collusive Affidavit
- Drug Free Workplace Certification
- Section 3 Certification
- References
- Sub-Contractor Listing
- Insurance Certificate
REQUIRED ATTACHMENTS
4- HUD 5369-A
- HUD 5370
- Davis-Bacon Wage Determination
- Bid Form Check List
- Scope location
- Henderson, KY
Questions about this BID
How do I respond to this Bid from Housing Authority of Henderson?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is July 13, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. For questions, contact Shannon Kavanaugh.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Housing Authority of Henderson in KY, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Shannon Kavanaugh at (270) 827-1294 ext 1136. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Bid Form, Non-Collusive Affidavit, Drug Free Workplace Certification, Section 3 Certification, References, Sub-Contractor Listing, Insurance Certificate. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Best low bid, Bid price, Quality of product" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Housing Authority of Henderson?
All active and historical solicitations from Housing Authority of Henderson are tracked and searchable. As a local housing authority agency, Housing Authority of Henderson regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 24 months. Contract terms may include renewal options.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: HUD 5369-A, HUD 5370, Davis-Bacon Wage Determination, Bid Form Check List. Review the full document from Housing Authority of Henderson for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Henderson, KY. Review the full solicitation for detailed scope requirements.