Cobb County School District - Band Tower for Kell HS - Invitation for Bid B26068 (2026)
- Due
- Jan 30, 2026
- Deadline passed
- Posted
- Jan 12, 2026
- Contract term
- 1 year
- Primary contact
- Lori Franji
- (770) 426-3364
The 30-second brief
Cobb County School District invites bids for the purchase and full turn-key installation of a band tower at Kell High School located in Marietta, GA (IFB B26068). The scope of work includes the removal and disposal of the existing band tower and concrete pad, subgrade preparation, concrete placement, and the installation of a new 30' to 40' band tower featuring a 6-inch deep concrete pad with steel rebar, one 10-foot base, three 10-foot stackable observation balconies, an 8-foot angled roof or crown, fully enclosed stairs, lockable security gate, and handrails with square tubing for percussion mounts. The project also requires rigging with a crane, loading, delivery, and site restoration. Bids are due by January 30, 2026, at 3:00 PM ET via the CCSD Euna Procurement Portal, with a mandatory pre-bid meeting scheduled for January 21, 2026.
Remove and dispose of existing band tower and concrete pad; install new band tower and concrete pad; 6" deep concrete pad with steel rebar and sand subbase; one (1) 10 ft. base; three (3) 10 ft. stackable observation balconies; 8 ft. angled roof or crown; standard black tower finish; fully enclosed stairs; lockable security gate; handrails made from 1.5" square tube for standard percussion mounts; loading and delivery; rigging (crane required); installation team on-site
Price, availability, lead time, past vendor experience, references, compliance with IFB specifications and requirements
Hear what Cobb County School District plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Cobb County School District invites bids for the purchase and full turn-key installation of a band tower at Kell High School located in Marietta, GA (IFB B26068).
The scope of work includes the removal and disposal of the existing band tower and concrete pad, subgrade preparation, concrete placement, and the installation of a new 30' to 40' band tower featuring a 6-inch deep concrete pad with steel rebar, one 10-foot base, three 10-foot stackable observation balconies, an 8-foot angled roof or crown, fully enclosed stairs, lockable security gate, and handrails with square tubing for percussion mounts. The project also requires rigging with a crane, loading, delivery, and site restoration. Bids are due by January 30, 2026, at 3:00 PM ET via the CCSD Euna Procurement Portal, with a mandatory pre-bid meeting scheduled for January 21, 2026.
EVALUATION CRITERIA
6- Price
- Availability
- Lead time
- Past vendor experience
- References
- Compliance with IFB specifications and requirements
REQUIRED DELIVERABLES
13- Remove and dispose of existing band tower and concrete pad
- Install new band tower and concrete pad
- 6" deep concrete pad with steel rebar and sand subbase
- One (1) 10 ft. base
- Three (3) 10 ft. stackable observation balconies
- 8 ft. angled roof or crown
- Standard black tower finish
- Fully enclosed stairs
- Lockable security gate
- Handrails made from 1.5" square tube for standard percussion mounts
- Loading and delivery
- Rigging (crane required)
- Installation team on-site
REQUIRED ATTACHMENTS
Bid Form(s), Acknowledgement and Agreement
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Scope location
- Marietta, GA
Questions about this BID
How do I respond to this Bid from Cobb County School District?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is January 30, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Lori Franji.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Cobb County School District in GA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Lori Franji at (770) 426-3364. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Remove and dispose of existing band tower and concrete pad; install new band tower and concrete pad; 6" deep concrete pad with steel rebar and sand subbase; one (1) 10 ft. base; three (3) 10 ft. stackable observation balconies; 8 ft. angled roof or crown; standard black tower finish; fully enclosed. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price, availability, lead time, past vendor experience, references, compliance with IFB specifications and requirements" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Cobb County School District?
All active and historical solicitations from Cobb County School District are tracked and searchable. As a school agency, Cobb County School District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 1 year. Contract terms may include renewal options.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Form(s), Acknowledgement and Agreement. Review the full document from Cobb County School District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Marietta, GA. Review the full solicitation for detailed scope requirements.