Alabama Dept. of Transportation - Micro-milling, Resurfacing, Patching, Guardrail, SR-25 - 2026
- Due
- Dec 4, 2026
- 14 days left
- Primary contact
- John R. Cooper
- (334) 353-6554
The 30-second brief
The Alabama Dept. of Transportation (DOT) invites bids for micro-milling, resurfacing (scrub seal), patching, guardrail installation, and traffic stripe on SR-25 from the junction of SR-3 (US-31) in Shelby, AL. Project work includes removing guardrail, unclassified excavation, borrow excavation, tack coat, micro-milling existing pavement, stone matrix asphalt binder layer, and superpave bituminous concrete wearing surface layer. Bids are due by December 4, 2026, at 10:00 AM. Submission location is 1409 Coliseum Blvd PO Box 303050, Montgomery, AL, 36110. This solicitation has some or all Local funding, and additional requirements may apply.
163 LF removing guardrail; 12 EA removing guardrail end anchor (all type); 159 CY unclassified excavation; 119 CY borrow excavation (loose truckbed measurement); 6, 090 GAL tack coat; 41, 620 SY micro-milling existing pavement (approximately 1.10" thru 2.00" thick); 2, 480 TN stone matrix asphalt binder layer, 1/2" maximum aggregate size; 1, 600 TN superpave bituminous concrete wearing surface layer, 3/8" maximum aggregate size mix, Esal range e; 490 TN superpave bituminous concrete wearing surface layer, Widening, 1/2" maximum aggregate size mix, Esal range c/d
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Alabama Dept. of Transportation (DOT) invites bids for micro-milling, resurfacing (scrub seal), patching, guardrail installation, and traffic stripe on SR-25 from the junction of SR-3 (US-31) in Shelby, AL. Project work includes removing guardrail, unclassified excavation, borrow excavation, tack coat, micro-milling existing pavement, stone matrix asphalt binder layer, and superpave bituminous concrete wearing surface layer.
Bids are due by December 4, 2026, at 10:00 AM. Submission location is 1409 Coliseum Blvd PO Box 303050, Montgomery, AL, 36110. This solicitation has some or all Local funding, and additional requirements may apply.
REQUIRED DELIVERABLES
9- 163 LF removing guardrail
- 12 EA removing guardrail end anchor (all type)
- 159 CY unclassified excavation
- 119 CY borrow excavation (loose truckbed measurement)
- 6, 090 GAL tack coat
- 41, 620 SY micro-milling existing pavement (approximately 1.10" thru 2.00" thick)
- 2, 480 TN stone matrix asphalt binder layer, 1/2" maximum aggregate size
- 1, 600 TN superpave bituminous concrete wearing surface layer, 3/8" maximum aggregate size mix, Esal range e
- 490 TN superpave bituminous concrete wearing surface layer, Widening, 1/2" maximum aggregate size mix, Esal range c/d
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Shelby, AL
- Reported agency
- Alabama Dept. of Transportation (DOT)
Questions about this BID
How do I respond to this Bid from AL-State-Alabama Department of Transportation?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 4, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact John R. Cooper.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including AL-State-Alabama Department of Transportation in AL, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is John R. Cooper at (334) 353-6554. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 163 LF removing guardrail; 12 EA removing guardrail end anchor (all type); 159 CY unclassified excavation; 119 CY borrow excavation (loose truckbed measurement); 6, 090 GAL tack coat; 41, 620 SY micro-milling existing pavement (approximately 1.10" thru 2.00" thick); 2, 480 TN stone matrix asphalt bi. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from AL-State-Alabama Department of Transportation?
All active and historical solicitations from AL-State-Alabama Department of Transportation are tracked and searchable. As a state agency, AL-State-Alabama Department of Transportation regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of December 4, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from AL-State-Alabama Department of Transportation for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Shelby, AL. Review the full solicitation for detailed scope requirements.