Moyock WWTP design package revisions
Currituck CountyNorth Carolina- Detected
- Nov 16, 2026
- 4 days ago
- Sector
- Utilities
Get pre-RFPs like this one as they surface.
Get briefs like this freeFree account · 30-second setup · No credit card
From the meeting
At its November 16, 2026 meeting the board confirmed direction for Design Package #3 for the Moyock Regional Wastewater Treatment Plant and the related revisions to Early Works Package #2. The design-build team recommended removing the 75,000-gallon Marolf equalization tank and influent flow meter vault, which would create a deductive change order. Design Package #3 would increase treatment capacity to 200,000 gpd and includes a 100,000 gpd ECC package plant plus upgrades to the existing ECC plant.
The board tentatively expected to approve the GMP in April 2027.
- Meeting date
- November 16, 2026
- Agency
- Currituck County
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will Currituck County issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Currituck County's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with Currituck County before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account sends you the pre-RFPs that fit what you sell, with the AI brief and the decision makers for the top matches in each digest.
Where can I find more utilities government opportunities in North Carolina?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 275,000+ state and local agencies and surfaces utilities pre-RFPs in North Carolina as soon as they appear — months before they reach bid portals.