Salisbury University Condenser Water Piping Repairs IFB SU-2427-SS / SU-HS-39-24
Salisbury UniversityHigher Ed · Salisbury, MD- Due
- Dec 6, 2023
- Deadline passed
- Posted
- Nov 3, 2023
Know who Salisbury University buys from before you write a word.
Every vendor contract, renewal date and decision maker at this agency, in one place.
Set up in 30 seconds · No credit card
SUMMARY
Salisbury University (SU) is issuing Invitation for Bid (IFB) SU-2427-SS / SU-HS-39-24 to secure a contractor for repairs to the condenser water and make-up water piping at Henson Science Hall.
The facility's system includes two cooling towers, two 519-ton chillers, and four 4,404,000 BTU boilers installed in 2002. Work must be coordinated with a scheduled system shutdown from January 2nd to January 22nd, during which a separate contractor will refurbish the cooling towers. The project focuses on maintenance of condenser water piping components and improvements to make-up water piping. Bids are due by December 6, 2023, at 4:00 PM.
REQUIRED ATTACHMENTS
10- IFB SU2427SS HS Repiar Condenser Water Piping.pdf
- Specs_SU-HS-39-24.pdf
- DRWS_SU-HS-39-24.pdf
- 10 Inch Piping at Chillers.jpg
- 14 Inch Piping Down Stream of Chillers.jpg
- Existing Refrigerant Monitor.jpg
- Incoming Water Service.jpg
- Amendment A001 for IFB SU-2427-SS.pdf
- Bid Tab_IFB SU-2427-SS.pdf
- Letter of intent to award.pdf
- Scope location
- Salisbury, MD
Questions about this RFP
How do I respond to this IFB from Salisbury University?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 6, 2023. Be sure to include all required attachments as outlined in the solicitation.
Can small businesses or minority-owned firms bid on this IFB?
Most government agencies, including Salisbury University in MD, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the IFB submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I search IFBs like this in ChatGPT or Claude?
Yes. Civic IQ has an MCP server that connects ChatGPT, Claude and other AI assistants to live Civic IQ data: open RFPs, pre-RFP signals from public meetings, awarded contracts and agency decision-makers across 100,000+ US public agencies. Add https://beta.mcp.civiciq.com/mcp as a connector (in ChatGPT under Settings > Apps & Connectors, in Claude under Settings > Connectors) and sign in with a free Civic IQ account at civiciq.com/mcp.
Show 3 more questions
Where can I find more RFPs from Salisbury University?
All active and historical solicitations from Salisbury University are tracked and searchable. As a higher ed agency, Salisbury University regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this IFB?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: IFB SU2427SS HS Repiar Condenser Water Piping.pdf, Specs_SU-HS-39-24.pdf, DRWS_SU-HS-39-24.pdf, 10 Inch Piping at Chillers.jpg, 14 Inch Piping Down Stream of Chillers.jpg, Existing Refrigerant Monitor. Review the full document from Salisbury University for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Salisbury, MD. Review the full solicitation for detailed scope requirements.