El Camino College AV Systems Procurement Quote 2025 - Journalism Room 113 and MBA Building
El Camino Community College DistrictHigher Ed · Torrance, CA- Due
- Nov 6, 2025
- Deadline passed
- Posted
- Oct 7, 2025
- Primary contact
- Steve Amezcua
- (310) 532-3670
Know who El Camino Community College District buys from before you write a word.
Every vendor contract, renewal date and decision maker at this agency, in one place.
Set up in 30 seconds · No credit card
THE 30-SECOND BRIEF
El Camino College is procuring AV system installations for Journalism Room 113 and the MBA Building from Golden Star Technology. The scope includes projectors, screens, audio systems, and control programming across multiple floors.
As-built drawings, Detailed control panel manual, Configurations codes, Equipment Owner's Manuals, Equipment Warranty Information
SUMMARY
El Camino College is procuring AV system installations for Journalism Room 113 and the MBA Building from Golden Star Technology. The scope includes projectors, screens, audio systems, and control programming across multiple floors.
REQUIRED DELIVERABLES
5- As-built drawings
- Detailed control panel manual
- Configurations codes
- Equipment Owner's Manuals
- Equipment Warranty Information
- Scope location
- Torrance, CA
- Reported agency
- El Camino College
Questions about this RFP
How do I respond to this Quote from El Camino Community College District?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 6, 2025. The solicitation specifies required deliverables that must be addressed in your response. For questions, contact Steve Amezcua.
Can small businesses or minority-owned firms bid on this Quote?
Most government agencies, including El Camino Community College District in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Quote submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Steve Amezcua at (310) 532-3670. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: As-built drawings, Detailed control panel manual, Configurations codes, Equipment Owner's Manuals, Equipment Warranty Information. Proposals should clearly address how each deliverable will be met.
Can I search Quotes like this in ChatGPT or Claude?
Yes. Civic IQ has an MCP server that connects ChatGPT, Claude and other AI assistants to live Civic IQ data: open RFPs, pre-RFP signals from public meetings, awarded contracts and agency decision-makers across 100,000+ US public agencies. Add https://beta.mcp.civiciq.com/mcp as a connector (in ChatGPT under Settings > Apps & Connectors, in Claude under Settings > Connectors) and sign in with a free Civic IQ account at civiciq.com/mcp.
Show 3 more questions
Where can I find more RFPs from El Camino Community College District?
All active and historical solicitations from El Camino Community College District are tracked and searchable. As a higher ed agency, El Camino Community College District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Quote?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from El Camino Community College District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Torrance, CA. Review the full solicitation for detailed scope requirements.