Alameda County Water District, Fremont, CA·Utility District
Track Alameda County Water District solicitations
Get alerted when Alameda County Water District posts a new RFP, and see the pre-RFP signals months before it publishes.
The Alameda County Water District is soliciting bids for the Alvarado-Niles Pipeline Seismic Improvement Project. The work consists of furnishing and installing approximately 1,900 linear feet of 14-inch diameter steel pipe and 7,950 linear feet of 16-inch diameter steel pipe, including 150 linear feet of 24-inch steel casing beneath railroad tracks. Additional scope includes installing service laterals, meter boxes, fire hydrants, air vacuum valves, cathodic protection systems, and a prefabricated steel bridge supported by concrete piers over a flood control channel. Contractors are also responsible for pressure testing, disinfection, removal of old pipelines, and restoration of surfaces including asphalt, concrete, and landscaping. Submissions are due by March 6, 2025, at 11:30 AM.
Common questions about this solicitation, answered from the record.
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is March 6, 2025.
All active and historical solicitations from Alameda County Water District are tracked and searchable. As a utility district agency, Alameda County Water District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Alameda County Water District for the complete list.
Most government agencies, including Alameda County Water District in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
This solicitation defines a specific project scope. The scope covers the following locations: Alameda County Water District Boardroom. Review the full solicitation for detailed scope requirements.
B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.
Other solicitations from Alameda County Water District.