Civic IQ
BidCLOSED

Cheshire High School: Fire Alarm System Upgrade

Cheshire School District, Cheshire, CT·School
Jan 16, 2026
Posted Date
Reported: Connecticut Department of Labor
(860) 263-6790
Cheshire, Connecticut

Summary

This document outlines the minimum wage rates and classifications for building construction for the Cheshire High School: Fire Alarm System Upgrade project in Cheshire, Connecticut.

Required Staffing Roles

Asbestos/Toxic Waste Removal Laborers, Asbestos Worker/Heat and Frost Insulator, Boilermaker, Bricklayer, Cement Mason, Concrete Finisher, Stone Masons, Tile Setter, Tile and Stone Finishers, Marble & Terrazzo Finishers, Plasterer, Terrazzo Mechanics & Marble Setters, General laborers, carpenter tenders, concrete specialists, wrecking laborers, fire watchers, Acetylene Burners, Mortar mixers, plaster tender, power buggy operators, powdermen, fireproofer/mixer/nozzleman, Jackhammer operators/pavement breaker, mason tender (brick), mason tender (cement/concrete), forklift operators and forklift operators (masonry), Pipelayers, Air track operator, sand blaster, hydraulic drills, Blasters, nuclear and toxic waste removal, Asbestos/lead removal and encapsulation, Bottom men on open air caisson, cylindrical work and boring crew, Top men on open air caisson, cylindrical work and boring crew, Traffic Control Signalman, Toxic Waste Removers A or B With PPE, Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, Metal Stud Installation, Form Work and Scaffold Building, Drywall Hanging, Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient Floor Layers, Millwrights, Carpenter - Welder, Carpenter: Working with creosote lumber or acid, Electrical Worker, Elevator Mechanic, Groundman, Linemen/Cable Splicer, Glazier, Ironworker, Ornamental, Reinforcing, Structural, and Precast Concrete Erection, Crane Handling or Erecting Structural Steel or Stone, Hoisting Engineer, Front End Loader, Work Boat, Cranes, Bauer Drill/Caisson, Excavator, Pile Driver, Gradall, Master Mechanic, Rubber Tire Excavator, Grader Operator, Bulldozer Finegrade, Trenching Machines, Lighter Derrick, CMI Machine, Koehring Loader, Goldhofer, Specialty Railroad Equipment, Asphalt Spreader, Asphalt Reclaiming Machine, Line Grinder, Concrete Pumps, Drills with Self Contained Power Units, Boring Machine, Post Hole Digger, Auger, Pounder, Well Digger, Milling Machine, Side Boom, Combination Hoe and Loader, Directional Driller, Front End Loader (3 up to 7 cubic yards), Bulldozer (rough grade dozer), Asphalt Roller, Concrete Saws and Cutters, Vermeer Concrete Cutter, Stump Grinder, Scraper, Snooper, Skidder, Milling Machine (24" and under mandrel), Mechanic, Grease Truck Operator, Hydroblaster, Barrier Mover, Power Stone Spreader, Welding, Work Boat Under 26 ft., Transfer Machine, Rigger Foreman, Front End Loader (under 3 cubic yards), Skid Steer Loader, Forklift, Power Chipper, Landscape Equipment, Vacuum Excavation Truck, Hydrovac Excavation Truck, Vibratory hammer, ice machine, diesel and air, hammer, Conveyor, earth roller, power pavement breaker, robot demolition equipment, Wellpoint Operator, Compressor Battery Operator, Elevator Operator, Tow Motor Operator, Generator Operator, Compressor Operator, Pump Operator, Welding Machine Operator, Heater Operator, Maintenance Engineer, Portable Asphalt Plant Operator, Portable Crusher Plant Operator, Portable Concrete Plant Operator, Portable Grout Plant Operator, Portable Water Filtration Plant Operator, Power Safety Boat, Vacuum Truck, Zim Mixer, Sweeper, Rigger, Signalman, Surveyor: Chief of Party, Surveyor: Assistant Chief of Party, Surveyor: Instrument Man, Surveyor: Rodman or Chainman, Brush and Roller, Taping Only/Drywall Finishing, Paperhanger and Red Label, Spray, Spray Helper, Blast, Blast Helper, Plumber, Well Digger, Pile Testing Machine, Roofer (composition), Roofer (slate & tile), Sheetmetal Worker, Pipefitter, Block Truck, 2 Axle, Helpers, 3 Axle, 2 Axle Mixer, 3 Axle Mixer, 4 Axle, 4 Axle Mixer, 5 Axle, 5 Axle Mixer, Heavy Duty Trailer (40 Tons and Over), Euclids and Semi-Trailer, Heavy Duty Trailer up to 40 tons, Snorkle Truck, Swivel Dump and Tack Truck, Sprinkler Fitter, Theatrical Stage Journeyman

Section 4.2 — Scope of Services and Deliverables

The selected vendor shall provide all labor, materials, equipment, and supervision necessary to perform the services described herein. Work shall commence within fifteen (15) calendar days of the Notice to Proceed and shall be completed within the timeframe specified in the project schedule attached as Exhibit B.

Proposals must include a detailed implementation timeline, staffing plan with key personnel qualifications, and three (3) references from comparable government engagements completed within the past five years. Evaluation will be based on technical approach (40%), experience and qualifications (30%), cost proposal (20%), and small business participation plan (10%).

Source Document Available

The full solicitation document, attachments, and evaluation details are available on Civic IQ. Book a demo to get access.

Frequently Asked Questions

How do I respond to this Bid from Cheshire School District?

To respond, review the full solicitation document for submission requirements, evaluation criteria, and deadlines.

Where can I find more RFPs from Cheshire School District?

Civic IQ tracks all active and historical solicitations from Cheshire School District. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts — giving you a complete picture of the procurement landscape.

What documents are required to bid on this Bid?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications or licenses, past performance references, and any forms or attachments specified in the solicitation. Review the full document from Cheshire School District for the complete list of required submissions.

Can small businesses or minority-owned firms bid on this Bid?

Most government agencies, including Cheshire School District in CT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Some solicitations include set-aside provisions or evaluation preferences for these firms. Check the full solicitation for any small business participation goals or requirements.

What happens after the Bid submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This process typically includes an initial compliance check, technical evaluation, cost analysis, and may involve oral presentations or interviews with shortlisted vendors. The timeline from submission to award varies but usually takes several weeks to months.

Stop chasing RFPs.
Start shaping them.

Somewhere in the country, an agency is discussing a project you could win. See the signal before your competitors do.