Civic IQ
Pre-RFPInfrastructure & MaintenanceDetected Jun 1, 2026

The Village Board is considering a detailed Development Agreement with Fox River Falls, LLC for Fox River Falls Addition No. 4, the fifth phase of a residential subdivision on the former Silver Spring Country Club golf course. This phase covers about 59.4 acres and 44 single‑family lots and requires full public infrastructure: sanitary sewer, water main (including a 12‑inch extension across future phases and along Lannon Road), storm sewer and stormwater management, roadway construction, sidewalks, asphalt multi‑use paths, street lighting, signage, grading, and related engineering and inspection work. The developer is responsible for design, construction, and all costs of public improvements, plus reimbursing the Village for review, construction management, inspection, and legal/administrative costs. The agreement lays out tight timelines (substantial completion of utilities and roads prior to final plat recording and no later than one year from the agreement; surface paving by October 15, 2028), extensive as‑built, GIS, and grading documentation requirements, and mandates coordination with MMSD, WisDOT, WDNR, Waukesha County, and utilities. This creates near‑term and multi‑year demand for civil contractors, survey/GIS firms, testing labs, traffic and stormwater engineers, inspection support, and specialty vendors for street lighting, signage, erosion control, and landscaping who can work either directly for the developer or as subcontractors aligned with Village standards.

Village requires a financial guarantee/letter of credit covering all infrastructure; as‑builts must ...

Menomonee Falls villageFox River Falls Addition No. 4 subdivision infrastructure buildout

Why this matters for vendors

Early signals like this typically surface 6–18 months before a formal RFP is posted. Vendors who engage during the planning window help shape requirements, build relationships with decision-makers, and position ahead of the competition before the solicitation goes public.

Infrastructure & Maintenance

Where this sits in the buying cycle

Now

Capital plan & early discussion

Next 1–2 Q

Scoping & vendor outreach window

6–18 mo

RFP / solicitation posted

Later

Award & contract

Related

Similar Signals

No similar signals found.

Platform Capabilities

How Civic IQ accelerates your sales

Uncover early buying signals, get real-time alerts, and push context-rich leads straight into your CRM.

Spot Demand Early

Detect the first hints of need in agendas, budgets, and strategic plans up to a year before formal procurement begins.

Real-Time Alerts & CRM Sync

Receive instant notifications and automatically enrich records in your connected CRM, keeping your pipeline current.

Connect with Stakeholders

Get current contact and contract details to reach the person running the project now, not someone who left months ago.

Monitor Competitors

Track competitor wins, contract expirations, and renewal timelines so you can perfectly time outreach.

1M+

Documents analyzed monthly

8M+

Vendors tracked

22M+

Documents indexed

24h

Max data refresh cycle

Bring us your territory.
We'll show you what is forming.

See live SLED buying signals, source docs, decision-makers, contract context, and the next step into your CRM or pipeline.

Try Civic IQ for free