Civic IQ
Contract AwardInfrastructure & MaintenanceDetected Jun 9, 2026

The Board will review and act on Change Order No. 2 for Colfax County Event Center improvements related to septic tank/leach field replacement and a new waterline service. This indicates an ongoing construction or infrastructure project at the event center with scope adjustments and additional work. While the prime contractor is already in place, change orders often reveal evolving needs and potential follow-on work in site utilities, civil engineering, and facility upgrades. Vendors can track this project to anticipate future phases, maintenance contracts, or similar infrastructure needs at other county facilities, including public safety and emergency operations sites.

The underlying event center project is active, with at least two change orders to date.

Ute Park Fire Department/ Colfax County District #3Event Center Septic System Replacement and Waterline Improvements Change Order

Why this matters for vendors

Early signals like this typically surface 6–18 months before a formal RFP is posted. Vendors who engage during the planning window help shape requirements, build relationships with decision-makers, and position ahead of the competition before the solicitation goes public.

Infrastructure & Maintenance

Where this sits in the buying cycle

Now

Capital plan & early discussion

Next 1–2 Q

Scoping & vendor outreach window

6–18 mo

RFP / solicitation posted

Later

Award & contract

Related

Similar signals forming now

Opportunities from other agencies that match this category and scope.

Budget Planning

The General Services department (Dept. 60) has a FY 2026-27 budget of 4,467,495 funded by Equipment Rental ISF and Retirement fund, with 3,368,652 in the Equipment Rental fund. Beyond the expanded internal staff (33 FTEs, including maintenance trades and custodians), the budget dedicates significant dollars to contract and professional services: 303,450 for maintenance & repair, 125,417 for contract services, 54,000 for other professional services, and 59,400 in special departmental expense, plus uniforms, boot allowances, and custodial supplies. These line items indicate continuing reliance on outside vendors for specialized maintenance, building systems repair, and possibly supplemental custodial or facility services. Facilities maintenance contractors, specialty trades (HVAC, electrical, plumbing), and janitorial-service vendors can use this budget signal to confirm the scale of outsourced work and time outreach to the Director of General Services as the department plans annual task orders, blanket contracts, or replacement of existing vendors.

Because this is an internal service fund (Equipment Rental ISF), there may be long-term vendor relat...

City of Compton
View signal
Budget Planning

The FY2026-2027 draft budget for Geneva CUSD 304’s Operations & Maintenance Fund shows total expenses rising to 14880758, including 3058505 for supplies, 3930681 for services, and 550000 for non-capital equipment plus 150000 for capital. Compared to the FY2025-26 projected 13512043, this represents a significant increase, especially in supplies and non-capital equipment, reflecting ongoing facilities upkeep and small-to-mid-sized improvements. The budget language notes that fund balance and transfers will support the district’s capital plan and fleet management, and lists capital cost controls and bus purchase costs as areas of concern. For facilities service providers, maintenance contractors, custodial and grounds vendors, and building systems/equipment suppliers, this signals continued purchasing in cleaning, HVAC, minor renovations, and facility supplies rather than a single large project. Engaging now around cost-effective maintenance contracts and bundled facility services could help the district manage inflation pressures within this expanded O&M budget.

O&M Fund is one of the sources for 4000000 in transfers to support capital and fleet management in F...

Geneva CUSD 304
View signal
Pre-RFP

The agenda lists Hattiesburg Clinic requesting conditional use approval to develop a parking lot on an EM‑3 zoned property at 7 Medical Blvd (two PPINs in Forrest County Ward 3). Securing conditional use is a prerequisite step before the clinic can move ahead with detailed design and construction of expanded parking infrastructure. No contractor or budget is referenced, indicating this is still in the entitlement and planning phase. This upcoming parking lot project will likely require civil engineering, paving, stormwater management, lighting, and possibly access control solutions, creating a near-term opportunity once approvals are in place.

Property identified as PPINs 17832 and 17834, EM-3 zoning at 7 Medical Blvd, Forrest County Ward 3.

City of Hattiesburg
View signal

Get alerts for similar opportunities

Get automatic alerts for signals in your industry — months before they become formal RFPs. No more searching.

Get Early Alerts

Platform Capabilities

How Civic IQ accelerates your sales

Uncover early buying signals, get real-time alerts, and push context-rich leads straight into your CRM.

Spot Demand Early

Detect the first hints of need in agendas, budgets, and strategic plans up to a year before formal procurement begins.

Real-Time Alerts & CRM Sync

Receive instant notifications and automatically enrich records in your connected CRM, keeping your pipeline current.

Connect with Stakeholders

Get current contact and contract details to reach the person running the project now, not someone who left months ago.

Monitor Competitors

Track competitor wins, contract expirations, and renewal timelines so you can perfectly time outreach.

1M+

Documents analyzed monthly

8M+

Vendors tracked

22M+

Documents indexed

24h

Max data refresh cycle

Bring us your territory.
We'll show you what is forming.

See live SLED buying signals, source docs, decision-makers, contract context, and the next step into your CRM or pipeline.

Try Civic IQ for free