Contract AwardCapital ProjectsDetected May 19, 2026

Council approved Change Order 003 with Meridian Engineering to design installation of a new automatic transfer switch, electrical details, and a concrete pad for a fixed backup diesel generator at the chlorination building. This adds $5,750 including HST to the current contract for Project 17-GI-23-00066, with the Town covering $521 in extra cost. Vendors in power systems, generators, and construction may see follow-on needs for supply, installation, and long-term maintenance once design is complete.

Scope is design only; generator supply/installation vendor is not named and may be procured separately.

Town of St. LawrenceChlorination building generator design

Why this matters for vendors

Pre-RFP signals like this typically surface 6–18 months before a formal RFP is posted. Vendors who engage during the planning window help shape requirements, build relationships with decision-makers, and position ahead of the competition before the solicitation goes public.

Capital Projects

Where this sits in the buying cycle

Now

Capital plan & early discussion

Next 1–2 Q

Scoping & vendor outreach window

6–18 mo

RFP / solicitation posted

Later

Award & contract

Trusted by teams at

Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo

Related

Similar pre-RFP signals forming now

Government opportunities from other agencies that match this category and scope.

Budget Planning

The line item is Capital Outlay. The 2026-2027 proposed budget shows $1,297,719, up from $332,605 under 2025-2026 Actual. In a school district budget, this line typically covers facilities, equipment, and other capital assets, but the notice does not name specific projects or vendors. The budget hearing was scheduled for September 14, 2026, so sellers would need to confirm which campus or asset purchases sit behind this proposed capital amount.

Oakley Unified School District 274
View pre-RFP signal
Pre-RFP

At its September 14, 2026 meeting, the commission recommended a Residential Planned Development District for Westhaven @ Glenridge on 24.29 acres. Carnegie Landworks, LLC proposed up to 91 dwelling units, including single-family homes, townhomes, and condominiums, plus open space, a park area, walking trails, and a connection to Glenridge Road. The zoning change is the key trigger; if it advances, site work and supporting infrastructure will follow.

Town of Glenville
View pre-RFP signal
Pre-RFP

At its September 14, 2026 meeting, the commission reviewed a site plan modification for Building 405 in Scotia Industrial Park. The original approval in December 2024 covered demolition of two 122,000 sq. ft. buildings and replacement with two 114,000 sq. ft. warehouses; this revision reduces Building 405 to 109,000 sq. ft. and adds a rear-setback variance. The project is still in design/review, so the remaining need is final approval and construction execution.

Town of Glenville
View pre-RFP signal

Get alerts for similar opportunities

Get automatic alerts for pre-RFP signals in your industry — months before they become formal RFPs. No more searching.

Sign up for free

Frequently Asked Questions

About this pre-RFP signal

What is a pre-RFP signal?

A pre-RFP signal is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on signals gives SLED and B2G vendors months of lead time to build relationships and shape requirements.

When will Town of St. Lawrence issue an RFP for this project?

Pre-RFP signals typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Town of St. Lawrence's meeting records, agendas, and budgets continuously and updates this signal as the project moves through the buying cycle toward an RFP.

How can vendors engage with Town of St. Lawrence before the RFP is published?

Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account unlocks this signal's source document, forecasted RFP timing, and verified Town of St. Lawrence decision-maker contacts.

Where can I find more capital projects government opportunities in South Dakota?

Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces capital projects pre-RFP signals in South Dakota as soon as they appear — months before they reach bid portals.

Platform Capabilities

How vendors win Capital Projects contracts with Town of St. Lawrence

Civic IQ turns public meeting agendas, budgets, and capital plans from South Dakota agencies into pre-RFP buying signals — so your team engages Capital Projects buyers months before the solicitation goes public.

Find Pre-RFP Opportunities First

Detect early Capital Projects buying signals in meeting agendas, budgets, and capital improvement plans in South Dakota — up to 18 months before the RFP is posted.

Real-Time Alerts & CRM Sync

Get instant alerts the moment Town of St. Lawrence signals a new project, and push context-rich government leads straight into your CRM.

Reach Decision-Makers First

Get verified contact details for the government officials running each Capital Projects project today — not someone who left months ago.

Track Competitors & Contract Expirations

Monitor competitor wins, government contract expirations, and renewal timelines in South Dakota so you can perfectly time your outreach.

1M+

Documents analyzed monthly

8M+

Vendors tracked

22M+

Documents indexed

24h

Max data refresh cycle

Customers booked meetings with these agencies through signal-based outreach

City of San Antonio

TX · Meeting booked

Kansas City

MO · Meeting booked

Westchester County

NY · Meeting booked

Contra Costa County

CA · Meeting booked

Illinois DOT

IL · Meeting booked

Town of Brookline

MA · Meeting booked

City of Dubuque

IA · Meeting booked

City of Las Cruces

NM · Meeting booked

Frederick County

MD · Meeting booked

City of Issaquah

WA · Meeting booked

Sumter County

FL · Meeting booked

City of Richmond

CA · Deal closed

Traverse City Schools

MI · Meeting booked

Regional School Dist. 10

CT · Deal closed

Plainview-Old Bethpage

NY · Meeting booked

Marana Unified District

AZ · Meeting booked

Bring us your territory.
We'll show you what is forming.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Try Civic IQ for free

Unlock this pre-RFP signalFree trial · no credit card

Sign up for free